01Steel or cement-board?
Both shells get the same seamless liner; the difference is the shell material. Steel panels are the quickest and the campaign option. Cement-board panels don't rust, hold heat better and give the shell the solidity of concrete.
- Steel panels · 1–3 weeks · on campaign
- Cement-board panels · 2–3 weeks · for plots near the sea
- Any size, depth and steps with both
02Why so quick?
The panels are made in the factory and assembled on site. After excavation and the base slab, the shell is built, the liner is laid and the pool is filled — no long concrete curing.
- Planned installation with a modular panel system
- Seamless liner, an easy-to-clean surface
- The liner can be renewed years later
03Included in the campaign
The turnkey price for 3 × 5, 4 × 8 and 5 × 10 m covers excavation, base and footing concrete, backfill, pool pipework, pump-filter-valve, antibacterial liner, installation, ladder and lighting.
- 3 × 5 m · £15,500
- 4 × 8 m · £19,500
- 5 × 10 m · £26,500
04The middle ground
Concrete panels combine the mass and strength of concrete with the speed of a panel system — a good balance if you want a permanent structure without months of building work.
- Precast reinforced-concrete shell
- A watertight inside with a seamless liner
- Easy surface renewal